1-6
Configuration procedure
# Enable PoE on GigabitEthernet 1/0/1 and GigabitEthernet 1/0/2, and configure their power supply
priority to
critical
.
z
Select
PoE
>
PoE
from the navigation tree and click the
Setup
tab to perform the following
configurations, as shown in
Figure 1-5
.
Figure 1-5
Configure the PoE ports supplying power to the IP telephones
z
Click to select ports GigabitEthernet 1/0/1 and GigabitEthernet 1/0/2 from the chassis front panel.
z
Select
Enable
from the
Power State
drop-down list.
z
Select
Critical
from the
Power Priority
drop-down list.
z
Click
Apply
.
# Enable PoE on GigabitEthernet 1/0/11 and configure the maximum power of the port to 9000
milliwatts.
z
Click the
Setup
tab and perform the following configurations, as shown in
Figure 1-6
.
Summary of Contents for 2928 - Baseline Plus Switch PWR
Page 92: ...1 9 Figure 1 7 Display the rate settings of ports ...
Page 105: ...1 4 Figure 1 3 Switch to the management level ...
Page 109: ...i Table of Contents 1 VCT 1 1 Overview 1 1 Testing Cable Status 1 1 ...
Page 114: ...1 2 Figure 1 2 Port traffic statistics ...
Page 279: ...1 28 Figure 1 26 The Port Setup tab ...
Page 331: ...i Table of Contents 1 Service Management 1 1 Overview 1 1 Configuring Service Management 1 2 ...