4-26
E
FUEL
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
OIL PUMP HOSES AND CABLE
REMOVAL
Follow the left “Step” for removal.
1
Bleed hose
1
2
Air bleed screw
1
3
Gasket
1
4
Bleed hose stay
1
5
Oil delivery hose
3
6
Oil delivery hose #1
1
7
Oil delivery hose #2
1
8
Oil delivery hose #3
1
9
Check valve
3
Reverse the removal steps for installation.
OIL PUMP
Содержание WaveRunner GP1300R
Страница 526: ...8 31 E HULL HOOD SEAT AND HANDGRIP SERVICE POINTS Seat lock inspection 1 Check Seat lock Damage wear Replace ...
Страница 575: ......
Страница 576: ......
Страница 577: ...YAMAHA MOTOR CO LTD Printed in Japan Mar 2003 0 7 1 CR E F G S Printed on recycled paper ...