
This technical document is our property. All copying or
forwarding to third parties has consequences under civil and
criminal law.
Denomination:
Date:
Weltestraße 3
88250 Weingarten
Drawing no.:
Article no.
Page:
Brief description / Operating instructions
STOZ pump (foot / flange / flange, vertical)
Type N / KSW
13.08.07
4/4
P
S
•
“KSW”: Direction of rotation does not depend on the direction of rotation
P
S
Dimensions, direction of rotation of rotation and flow
The dimensions and the direction of rotation and flow of the individual pump versions
are given in our brochure or in the associated drawings.
5. Installation – assembly
All lines are to be connected oil- and air-tight. The pump is to be installed in accordance with
the installation position with the aid of the fixing holes provided for this purpose and the
standardised tightening torque.
6. Commissioning
For initial commissioning or after a standstill time of more than 6 months, the pump is
to be filled with oil before commissioning.
7. Maintenance
STOZ pumps are maintenance-free, as they are lubricated by the pumping medium.
We recommend replacing wear and sealing parts after an operating period of
approx. 45,000 hours.
B 5959 EN 08.07
4/4
Содержание Warman 650 M200-MCR-G
Страница 1: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 97: ...SUPLEMENTO M9 DEL MANUAL EMITIDO JUNIO DE 1998 7 Copyright WARMAN INTERNATIONAL LTD ...
Страница 125: ......
Страница 126: ......
Страница 127: ......
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 133: ......
Страница 243: ......
Страница 244: ......
Страница 257: ...Operating Instructions DOUBLE FILTER type series 4 225 last updated 2007 07 rev FRE 01 B 5922 EN 04 10 1 16 ...
Страница 274: ......