Benchmark with Edge [I]: Operation-Maintenance Manual
SECTION 3 - START SEQUENCE
OMM-0145_A99
• GF-218 • 9/18/2019 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
37
of
157
Start Sequence
Figure 3-5: Air/Fuel Valve In Ignition Position
7. Up to 4 seconds are allowed for ignition to be detected. The ignition circuit is turned off one second
after flame is detected.
8. After 2 seconds of continuous flame, the flame strength is indicated. After 5 seconds, the
Unit
Status
screen appears.
9.
With the unit firing properly, it will be controlled by the temperature control circuitry. The boiler’s fire
rate or valve position (depending on which was chosen in Section 4.2.2:
Front Panel Configuration
of the
Edge [i] Controller Manual
, OMM-0141, GF-213-B) will continuously display on the
Controller’s bargraph.
10.
Once the demand for heat has been satisfied, the Edge [i] Controller will turn off the SSOV gas
valve. The blower relay will be deactivated and the Air/Fuel Valve will be closed.
Standby
is
displayed.
TO BLOWER
AIR IN
IGNITION
VALVE POSITION
DIAL AT
25% to 35%
STEPPER
MOTOR