Benchmark with Edge [I]: Operation-Maintenance Manual
SECTION 3 - START SEQUENCE
OMM-0145_A99
• GF-218 • 9/18/2019 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
35
of
157
Start Sequence
Figure 3-2b: BMK1500
– 6000 Air/Fuel Valve In Purge Position
5. Next, the Blower Proof and Blocked Inlet switches close (Figure 3-4a and 3-4b). On the Ignition
Sequence screen the
Purging
indicator turns grey while purging is underway (Figure 3-3) and
Purge Timer
displays the purge cycle
’s elapsed time in seconds.
Figure 3-3: Ignition Sequence Screen
– Purging
Figure 3-4a: BMK750 & 1000 Blower Proof Switch
TO BLOWER
STEPPER
MOTOR
AIR IN
PURGE
VALVE POSITION
DIAL AT 100%
BLOWER PROOF SWITCH
BLOCKED INLET SWITCH