4-15
INSTALLATION-CONFIGURATION
SECTION 400-096-204
SEPTEMBER 1992
CONFIGURATION GUIDE, WORKSHEET 2
Customer:
Location:
A. PDKU PCBs (eight station ports)
Actual PDKU PCBs = (AT)
(PDKU/PEKU PCB requirements)
1. Determine the total PDKU ports required using Chart 1A.
CHART 1A—PDKU PORT REQUIREMENTS
Equipment Type:
Equipment
Quantity
X
(Ports/
per)
=
Ports Used
DDSS consoles:
(see Worksheet 1, A1)
DDCBs
(see Worksheet 1, A2)
PDIU-DSs:
(see Worksheet 1, A3)
Digital telephones (with or
without PDIU-DIs):
(see Worksheet 1, A4)
(A1)
(A2)
(A3)
(A4)
X
X
X
X
1
1
1
1
=
=
=
=
=
.
.
.
.
.
2. Determine the minimum PDKU PCBs required using Chart 2A.
Total PDKU Ports
CHART 2A—MINIMUM PDKU PCB REQUIREMENTS
Total
Ports
(Chart 1A)
Minimum
PDKU
PCBs
(Am)
01 ~ 08 09 ~ 16 17 ~ 24 25 ~ 32 33 ~ 40 41 ~ 48 49 ~ 56 57 ~ 64 65 ~ 72 73 ~ 80 81 ~ 88 89 ~ 96
1
2
3
4
5
6
7
8
9
10
11
12
3. Determine the actual PDKU PCBs required using Charts 1A and 2A as follows:
Actual PDKUs (AT) = (Am) or (A1) or (A2), whichever is the largest number.
Содержание Strata DK 24
Страница 2: ......
Страница 10: ......
Страница 12: ...INSTALLATION SYSTEM DESCRIPTION SECTION 400 096 202 SEPTEMBER 1992 ...
Страница 42: ......
Страница 72: ......
Страница 102: ......
Страница 110: ......
Страница 144: ...INSTALLATION TELEPHONE SECTION 400 096 207 SEPTEMBER 1992 ...
Страница 164: ......
Страница 166: ...INSTALLATION PERIPHERALS SECTION 400 096 208 SEPTEMBER 1992 ...
Страница 170: ......
Страница 238: ...INSTALLATION WIRING DIAGRAMS SECTION 400 096 209 SEPTEMBER 1992 ...
Страница 300: ......
Страница 302: ...REMOTE ADMINISTRATION MAINTENANCE PROCEDURES SECTION 400 096 600 SEPTEMBER 1992 ...
Страница 372: ......