Commissioning
5.3 Procedure for commissioning with STARTER
Enclosed Drives
Operating Instructions, 12/2018, A5E36652151A
205
The STARTER project wizard
Figure 5-3
STARTER project wizard
⇒
Click Arrange drive units offline... in the STARTER project wizard.
Figure 5-4
Create new project
⇒
Enter a project name and, if necessary, the author, memory location and a comment.
⇒
Click Next > to set up the PG/PC interface.
Содержание SINAMICS S150 NEMA
Страница 1: ......
Страница 2: ......
Страница 20: ...Table of contents Enclosed Drives 18 Operating Instructions 12 2018 A5E36652151A ...
Страница 42: ...Device overview 2 5 Rating plate Enclosed Drives 40 Operating Instructions 12 2018 A5E36652151A ...
Страница 200: ...Electrical installation 4 9 Additional connections Enclosed Drives 198 Operating Instructions 12 2018 A5E36652151A ...
Страница 500: ...Output terminals 8 3 Digital outputs Enclosed Drives 498 Operating Instructions 12 2018 A5E36652151A ...
Страница 828: ...Technical specifications 12 3 Technical specifications Enclosed Drives 826 Operating Instructions 12 2018 A5E36652151A ...
Страница 861: ......
Страница 862: ......