80/327
Building Technologies
Basic Documentation LMV5...
CC1P7550en
5 Sequence diagrams
22.05.2018
Phases
00 Lockout
phase
01 Safety
phase
10 Homerun
12 Standby
(stationary)
21 Shutoff valve ON (start release)
22 Fan motor ON
24 Prepurge
position
30 Prepurge time (tv1)
32 Prepurge time (tv)
34
Prepurge time (tv2) (flue gas recirculation FGR)
36 Ignition
position
38 Preignition (Z) ON
40 Burner valve ON
42 Ignition
OFF
44 Interval 1 (ti1)
50 2
nd
safety time
52 Interval 2 (ti2)
54 Low-fire
position
60 Operation 1 (stationary)
62 Operation
2
Low-fire position
70 Postburne
time
72 Postpurge
position
74 Postpurge time (tn1)
76 Flue gas recirculation postpurge position
78 Postpurge time (tn3)
79 Direct
start
80 Valve proving evacuating
time
81 Valve proving time atmospheric pressure
82 Valve proving filling time
83 Valve proving time gas pressure
Legend to the sequence diagrams