35/327
Building Technologies
Basic Documentation LMV5...
CC1P7550en
4 Burner control
22.05.2018
4.1.1.5 QRA2 / QRA4 / QRA10 with AGQ1
(for intermittent operation only)
Β
Note!
AGQ1 is only available for AC 230 V mains voltage.
Power supply in operation
DC 280…325 V
Power supply in test mode
DC 350…450 V
Attention!
In order to ensure that a higher voltage is supplied to the UV cell for the
extraneous light test in phase 21 (via fan output X3-01 pin 1), parameter
MinTmeStartRel
(minimum time for phase 21) must be parameterized to at least
5 seconds.
For more detailed information about QRA2 / QRA10, refer to Data Sheet N7712.
For more detailed information about QRA4, refer to Data Sheet N7711.
Caution!
Flame detectors QRA2 / QRA4 / QRA10 must not be used when extraneous light
suppression is activated since detector tests are not made in that case
(parameter
ExtranLightTest
= deactivated)
Possible ionization current
Max. DC 10 µA
Display flame approx. 100%
(with factory setting of the parameter
StandardFactor
)
Ionization current required
Min. DC 6 µA
Display flame approx. 50%
(with factory setting of the parameter
StandardFactor
)
Permissible ionization current during
extraneous light test
Max. DC 0,3 µA
In connection with the LMV5, ancillary unit AGQ1.xA27 must be used.
Power supply
AC 230 V
Possible current
Max. 500 µA
Current required
Min. 200 µA
QRA
LMV5
AGQ1.xA27