2–10 • Installation
Synergy Series Installation Guide (v18)
•
Note that an air filter is mounted on the back of the tray, behind the fans. This filter
should be cleaned periodically.
3. Frame CPU Board / Aux Bus Board
At the bottom of the chassis, the
Frame CPU Board
and
Aux Bus Board
connect
together, and are housed in the bottom slot.
•
If the
Timed Aux Bus
option is installed in the field, the option’s
Serializer
Module
and
De-serializer Module
install on the
Aux Bus Board
.
4. MLE Carrier Board
This board houses up to four identical “daughter” boards — one for each MLE installed
in your system.
•
Each
MLE Board
has positions for two additional option cards:
~
A
2D
or
3D Squeeze & Tease
card can be installed on the right side of the
MLE Board
~
A
Dual Border Generator
card can be installed on the left side of the
MLE
Board
5. Re-entry Board
The Re-entry Board is a half-depth board that controls the switcher’s re-entry pathways.
6. Input Crosspoint Board Slots
Eight slots are provided for 8-input digital video crosspoint boards — for a maximum of
64 digital inputs. Each crosspoint board is
identical
, and any crosspoint board can be
installed in
any slot
. Configuration of each input is performed through the menu system.
Warning
When the power supply tray is inserted into the frame, it mates with
male power pins that carry
live voltage
if the frame is plugged in. All
power
must
be disconnected before servicing
Caution
Do
not
insert your fingers into the power supply slot when the unit is
plugged in!
Warning
The
Frame CPU Board
(labeled
Frame Processor Module
4000A-003
on the card front edge)
must be installed only in slot
4
of
the Frame, as illustrated in the
Synergy Series Frame, Front View
diagram above. Damage to Card and Frame will occur, otherwise.
Warning
The
MLE Carrier Board
(labeled
MLE Carrier
4000A-002
on the
card front edge)
must be installed only in slot
5
of the frame, as
illustrated in the
Synergy Series Frame Front View
diagram above.
Damage to Card and Frame will occur, otherwise.
Note
In the event of the failure of a
Re-entry Board
, an
Input Crosspoint
Board
can be used in place of the failed
Re-entry Board
in an
emergency.
Содержание Synergy 2 SD
Страница 1: ...Ross Video Limited Installation Guide Volume I Software Issue 18...
Страница 10: ......
Страница 18: ...viii Contents Synergy Series Installation Guide v18...
Страница 88: ...2 44 Installation Synergy Series Installation Guide v18...
Страница 122: ...4 18 Preliminary Video Installation Synergy Series Installation Guide v18...
Страница 132: ...5 10 Using the Menu System Synergy Series Installation Guide v18...
Страница 156: ...6 24 BNC Configuration and Check Synergy Series Installation Guide v18...
Страница 292: ...9 62 Additional Installation Setups Synergy Series Installation Guide v18...
Страница 326: ...11 10 Still Stores Synergy Series Installation Guide v18...
Страница 346: ...12 20 Editors OverDrive Synergy Series Installation Guide v18...
Страница 394: ...GL 4 Glossary of Terms Synergy Series Installation Guide v18...