![Ross Synergy 1 Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/ross/synergy-1/synergy-1_maintenance-manual_1489025062.webp)
3–16 • Software Upgrades
Synergy 1 and Synergy 100 Maintenance Guide (v16-S1)
Frame Jumpers and Switches
The following figure illustrates the location of jumpers and switches on the front edge of the
Frame
CPU Board
:
Frame Jumpers and Switches
1. Reset Switch
Press the red
RESET
switch on the frame to initiate a
full system
reset. When the reset is
initiated from the frame, the control panel’s reset is initiated via a software message that
is passed along the RS-422 control cable. In the unlikely event that the control panel has
crashed, it may be necessary to
manually
reset the control panel. Refer to the section,
”on page 3-18 for additional information.
2. DIP Switch 1
This 8-position DIP switch is reserved for future use. Please leave all switches in the
default
Down
position, as labeled on the switch. (Early issue boards may find this
switch unpopulated).
3. DIP Switch 3
This 8- position DIP switch has the following system assignments (from left to right):
•
SW1 to SW7
—
These assignments are
Reserved
and must be left in their default
Down
positions.
•
SW8
—
This switch controls the ability to upgrade the
Squeeze & Tease 3D
software from a storage device as follows:
~
Up
— Software can be upgraded from a storage device, such as a floppy disk
or USB key. Refer to Chapter 2 “
Installation and Setup
” in your
Synergy 100
Squeeze & Tease 3D/WARP Owner’s Guide
for instructions.
~
Down
— Software can not be upgraded from a storage device. This is the
default position.
4. DIP Switch 2
This 8-position DIP switch has the following system assignments (from left to right):
Caution
Static discharge can cause serious damage to sensitive semiconductor
devices. Touch the frame to dissipate static charge before removing
boards from the frame and exercise proper grounding precautions
when working on circuit boards.
1) Reset Switch
2) DIP Switch 1, Reserved
3) DIP Switch 3
4) DIP Switch 2
5) DIP Switch 4
6) Watch Dog Jumper
Rear of Frame
Front of Board
Frame CPU Board
WATCH
DOG
2
6
RESET
3
DIP SW1
DIP SW3
DIP SW2
4
DIP SW4
1
5
Содержание Synergy 1
Страница 1: ...Ross Video Limited Synergy 1 and Synergy 100 Maintenance Guide Software Version 16 S1...
Страница 10: ......
Страница 16: ...vi Contents Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 24: ...1 8 Introduction Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 70: ...3 24 Software Upgrades Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 108: ...5 12 Frame Processor CPU Board Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 122: ...6 14 Working with Installed Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 142: ...8 14 Power Supplies Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 172: ...9 30 Calibration and Diagnostics Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 186: ...10 14 Control Panel Boards Synergy 1 and Synergy 100 Maintenance Guide v16...
Страница 230: ...13 20 Miscellaneous Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 240: ...IX 10 Index Synergy 1 and Synergy 100 Maintenance Guide v16 S1...