![Ross Synergy 1 Скачать руководство пользователя страница 139](http://html1.mh-extra.com/html/ross/synergy-1/synergy-1_maintenance-manual_1489025139.webp)
Synergy 1 and Synergy 100 Maintenance Guide (v16-S1)
Power Supplies • 8–11
9. Install the new power supply as follows:
•
Unpack the new power supply tray, and insert it into the Synergy frame.
•
Slide the lock down plate into the downward position.
•
Secure the plate using the screws provided with the new power supply.
10. Plug the AC power cord back into the AC outlet and turn on the frame power.
11. Ensure that the green
PWR ON
LED is lit.
This completes the procedure to change a Synergy frame power supply.
Note
For the frame supply, there is no calibration procedure required. The
supply is factory set.
Содержание Synergy 1
Страница 1: ...Ross Video Limited Synergy 1 and Synergy 100 Maintenance Guide Software Version 16 S1...
Страница 10: ......
Страница 16: ...vi Contents Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 24: ...1 8 Introduction Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 70: ...3 24 Software Upgrades Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 108: ...5 12 Frame Processor CPU Board Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 122: ...6 14 Working with Installed Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 142: ...8 14 Power Supplies Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 172: ...9 30 Calibration and Diagnostics Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 186: ...10 14 Control Panel Boards Synergy 1 and Synergy 100 Maintenance Guide v16...
Страница 230: ...13 20 Miscellaneous Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 240: ...IX 10 Index Synergy 1 and Synergy 100 Maintenance Guide v16 S1...