![Ross Synergy 1 Скачать руководство пользователя страница 101](http://html1.mh-extra.com/html/ross/synergy-1/synergy-1_maintenance-manual_1489025101.webp)
Synergy 1 and Synergy 100 Maintenance Guide (v16-S1)
Frame Processor (CPU) Board • 5–5
Frame Jumpers and Switches
The figure below illustrates the location of jumpers and switches on the front edge of the
Frame
Processor Board
:
Frame Jumpers and Switches
1. Reset Switch
Press the blue
RESET
switch on the Synergy frame to initiate a
full system
reset. When
the reset is initiated from the frame, the control panel’s reset is initiated via a software
message that is passed along the RS-422 control cable. In the unlikely event that the
control panel has crashed, it may be necessary to
manually
reset the control panel. Refer
to the “
System Reset Notes
” section of either the
Synergy 1 Installation Guide
or the
Synergy 100 Installation Guide
for additional information.
2. DIP Switch 1
This 8-position DIP switch is reserved for future use. Please leave all switches in the
default
Down
position. (Early issue boards may find this switch unpopulated).
3. DIP Switch 3
This 8-position DIP switch has the following system assignments (from left to right):
•
SW1 to SW7
—
Reserved
. Leave in the default
Down
position.
•
SW8
— This is the
Squeeze & Tease 3D Software Upgrade
switch. This switch
controls the ability to upgrade the
Squeeze & Tease 3D
software from a storage
device:
~
Up
— Software can be upgraded from a storage device, such as a floppy disk
or USB key. Refer to the section “
Squeeze & Tease 3D
Software Upgrade
” in
the
Squeeze & Tease 3D/WARP Owner’s Guide
for instructions.
~
Down
— Software can not be upgraded from a floppy disk or USB key. This is
the default position.
1) Reset
3) DIP Switch SW3
5) DIP Switch SW4
2) DIP Switch SW1, Reserved
4) DIP Switch SW2, Reserved
6) Watchdog Jumper
Note
In the following descriptions, the switch position
Up
indicates the
switch is
away
from the front of the board, while the
Down
position
refers to the switch being
towards
the front of the board.
Rear of Frame
Front of Board
Frame CPU Board
WATCH
DOG
2
6
RESET
3
DIP SW1
DIP SW3
DIP SW2
4
DIP SW4
1
5
Содержание Synergy 1
Страница 1: ...Ross Video Limited Synergy 1 and Synergy 100 Maintenance Guide Software Version 16 S1...
Страница 10: ......
Страница 16: ...vi Contents Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 24: ...1 8 Introduction Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 70: ...3 24 Software Upgrades Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 108: ...5 12 Frame Processor CPU Board Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 122: ...6 14 Working with Installed Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 142: ...8 14 Power Supplies Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 172: ...9 30 Calibration and Diagnostics Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 186: ...10 14 Control Panel Boards Synergy 1 and Synergy 100 Maintenance Guide v16...
Страница 230: ...13 20 Miscellaneous Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Страница 240: ...IX 10 Index Synergy 1 and Synergy 100 Maintenance Guide v16 S1...