IMR01Y36-E2
83
8. USAGE EXAMPLE
This chapter describes a usage example of DeviceNet communication when connected with the
COM-JH and controller (SRZ) with the PLC set to a master.
8.1 Handling Procedures
To avoid error at operation start-up, COM-JH must be powered on LAST (after the
controller, PLC, etc.).
Refer to
8.2 System Configuration (P. 84)
.
Refer to
5. SETTING (P. 20)
and
8.3 Setting of Use
Instruments (P. 85)
.
For network laying requirement of DeviceNet/method, refer
to Instruction Manual of master product or website of ODVA
(Open DeviceNet Vender Association).
URL: http://www.odva.org
Refer to
6. DeviceNet COMMUNICATIONS (P. 26)
and
the Instruction Manual of Configuration Tool.
Refer to
8.4 Sample Programs (P. 86)
and PLC Instruction
Manual.
•
For mounting/wiring of COM-JH, refer to
3. MOUNTING
(P. 7)
and
4. WIRING (P. 11)
.
•
For mounting/wiring of controller, refer to
Z-TIO
Instruction Manual (IMS01T01-E )
.
•
For mounting/wiring of PLC, refer to Instruction Manual
for the used PLC.
Preparations of
configuration instrument
Mounting and Wiring
Setting of use instruments
Communication items
setting
Programming