T
echnical
B
ulletin
PAGE: 1/2
Reissued:30-Jan-14
Model:
Taurus C1/P1 (D074/D075/M044)
Date:
06-Feb-13
No.:
RD074100a
RTB Reissue
The items in
bold italics
were corrected or added.
Steps 12 and 13 have been added in the revision.
Reason: SP2920-001 is needed to initialize the position of the ITB after its replacement and
cleaning/replacement of the feedback sensor.
Please add the following steps in red in the “Field Service Manual” in the section:
4. Replacement and Adjustments
>
Image Transfer Belt (ITB) Unit
>
After Transfer Belt
Replacement
1. The machine power must be OFF.
2. Open both front doors.
3. Remove the front cover of the ITB cleaning unit.
4. Rotate both levers of the ITB cleaning unit clockwise to retract the blades from the ITB.
5. Remove the PTR unit.
6. Turn the main power switch ON and close both front doors.
7. Enter the SP mode.
8. Reset the counter for the replaced ITB belt
9. Open the right front door and execute SP2310-001 (Force Lubricant - Belt Cleaning).
10. Immediately after executing, close the right door to run the above SP.
11. Wait for about 5 minutes. When you see "Completed" displayed on the operation panel,
you are ready to continue.
Subject:
Service Manual Correction (After ITB replacement)
Prepared by:
S. Sasaki
From:
1
st
PP Tech Service Sec., PP Tech Service Dept.
Classification:
Troubleshooting
Mechanical
Paper path
Product Safety
Part information
Electrical
Transmit/receive
Other ()
Action required
Service manual revision
Retrofit information
Tier2