Panasonic Electric Works Nordic AB
MEW01091
Rev: 3
EBL128 Operating Instructions V1.1.x
26
7.6
Access level 4
Used by Service / maintenance / commissioning engineers when a PC
(i.e.
Win128
) is to be connected to EBL128 for download of new S/W
/ settings / configurations / C.U. data, on-line status checking, etc.
Connect the PC and logon to EBL128 from the PC (Win128).
Содержание MEW01091
Страница 2: ...This page has deliberately been left blank ...
Страница 141: ...This page has deliberately been left blank ...