Table of Contents
v
Table of Contens
Selecting and Preparing a Site for Installation ...................................... 11
Enabling the RTC (Real-Time Clock) Battery ........................................ 23
Operation Keys ........................................................................... 52
About the Display ........................................................................ 54
Display Modes ............................................................................ 58
Learning to Use the Keypad ................................................................... 61
Display Mode Selection .............................................................. 61
Operation Modes ........................................................................ 62
Switching between Groups in Parameter Display Mode ......... 64
Switching between Groups in User & Macro Mode ................. 65
Navigating through the Codes (Functions) ............................... 66
Navigating Directly to Different Codes....................................... 68
Parameter Settings available in Monitor Mode ......................... 70
Setting the Monitor Display Items .............................................. 72
Selecting the Status Bar Display Items ..................................... 73
Monitoring Faults during Inverter Operation ............................. 75
Monitoring Multiple Fault Trips ................................................... 76
Switching between the Operation Modes (HAND / AUTO / OFF) ....... 81
Setting Frequency Reference ................................................................ 86
Keypad as the Source (KeyPad-1 setting) ................................ 87
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...