![LS ELECTRIC LSLV-H100 Series Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/ls-electric/lslv-h100-series/lslv-h100-series_user-manual_1943798023.webp)
Preparing
the Installation
10
1.3 Installation Considerations
Inverters are composed of various precision, electronic devices, and therefore the
installation environment can significantly impact the lifespan and reliability of the product.
The table below details the ideal operation and installation conditions for the inverter.
Items
Description
Ambient Temperature*
-10
℃
–50
℃
(40
℃
and above, 2.5% /
℃
Current Derating
search. 50
℃
75% of the rated current of the drive if possible)
Ambient Humidity
95% relative humidity (no condensation)
Storage Temperature
- 4
–149
F (-20
–65
℃
)
Environmental Factors
An environment free from corrosive or flammable gases, oil residue
or dust
Altitude
Maximum 3,280 ft (1,000m) above sea level for standard operation.
After that the driver rated voltage and the rated output current
derating by 1% for every extra 328 ft (100m) up to 13,123 ft
(4,000m).
Vibration
less than 1.0 G (9.8m/sec
2
)
Air Pressure
70
–106 kPa
*
The ambient temperature is the temperature measured at a point 2” (5 cm) from the
surface of the inverter.
Do not allow the ambient temperature to exceed the allowable range while operating the
inverter.
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...