196
Learning Advanced Features
Code
Description
during a pump clean.
AP2-22 PumpClean AccT
AP2-23 PumpClean
DecT
Sets the Acc/Dec times for pump clean operations.
AP2-24 Fwd Steady Time
AP2-26 Rev Steady Time
Sets the time to maintain forward and reverse operations.
AP2-25 Fwd SteadyFreq
AP2-27 Rev SteadyFreq
Sets the forward and reverse operation frequencies.
AP2-28 PC Num of Steps
Determines the number of steps
(acceleration/deceleration/stop) in one cycle. Each operation,
either in the forward or reverse direction, constitutes one step.
If set to ‘2,’ one forward step and one reverse step constitute
one cycle.
AP2-31 PC End Mode
Determines the inverter operation after pump clean operation.
Setting
Function
0
Stop
This stops the inverter after pump cleaning.
1
Start
The inverter oper
ates based on the inverter’s
command status after the pump cleaning. (If
a terminal command is received, the inverter
performs the operation it was performing
before the pump clean operation.)
AP2-29 Repeat Num
Mon
Displays the number of the current pump cleaning cycle.
AP2-30 Repeat Num Set
Sets the number of cycles for one pump clean operation set
at AP2-21
–AP2-28.
AP2-32 PC Limit Time
AP2-33 PC Limit Num
Frequent pump clean operations may indicate a serious
system problem. To warn the users of potential system
problems, an error (CleanRPTErr) occurs if the number of
pump clean operation exceeds the number set at AP2-33
within the time period set at AP2-32.
Note
•
When the run prevent feature is active and an operation in the prevented direction is
required to perform a pump clean operation, the inverter operates at the 0 speed for the
time set at AP2-24 and AP2-26 (Steady Time).
•
To stop the pump clean operation, press the OFF key on the keypad or turn it off at the
terminal input.
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...