252
Learning Advanced Features
Easy Start On Setting Details
Use caution when turning on the inverter after Easy Start On configuration. If codes such as PRT-08
(Reset Restart), COM-96 (PowerOn Resume), or CON-71 (SpeedSearch) are configured in Easy
Start On, the inverter may start operating as soon as it is powered on.
5.41 Config (CNF) Mode
Code
Description
CNF-61
Easy
Start On
Follow the procedures listed below to set the easy start on parameters.
No
Procedures
1
Set CNF-61 (Easy Start On)
to
‘1(Yes)’.
2
Select
‘
1 (All Grp)
’ in CNF-40
(Parameter Init) to initialize all parameters
3
Restarting the inverter will activate Easy Start On. Set the values in the
following screens on the Keypad. To escape from Easy Start On, press the
[ESC] key.
•
Start Easy Set:
Select ‘Yes’.
•
CNF-43: Select a macro.
•
BAS-10 60/50 Hz Sel: Set motor rated frequency.
•
DRV-14 Motor Capacity: Set motor capacity.
•
BAS-13 Rated Curr: Set motor rated current.
•
BAS-15 Rated Volt: Set motor rated voltage.
•
BAS-11 Pole Number: Set motor pole number.
•
BAS-19 AC Input Volt: Set input voltage.
•
PRT-08 Select start at trip reset
•
PRT-09 Retry Number: Sets the number of restart trial when
performing a trip reset.
•
COM-96 PowerOn Resume: Sets the serial communication
restart function.
•
CON-71 SpeedSearch: Set SpeedSearch.
•
DRV-06 Cmd Source: Set command source.
•
DRV-07 Freq Ref Src: Set Frequency Reference source.
•
AP3-01 Now Date : Set the current date.
•
AP3-02 Now Time : Set the current time.
When the settings are complete, the minimum parameter settings on the
motor have been made. The Keypad will return to a monitoring display.
Now the motor can be operated with the command source set at DRV-06.
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...