195
Learning Advanced Features
Code
Description
AP2-15 PumpClean
Mode
Sets the pump mode.
Setting
Function
0
None
Pump Clean function is not used.
1
DI
defendant
Set one of the terminal inputs to ‘46 (Pump
Clean Sel)’ and performs the pump clean
operation by turning on the terminal.
2
Power
Performs a pump clean operation when a
pump consumes more power than it is
supposed to consume in a normal
operation.
3
Current
Performs a pump clean operation when a
pump consumes more current than it is
supposed to consume in a normal
operation.
AP2-16 PumpClean Sel
Sets the pump clean start mode.
Setting
Function
0
None
Pump clean is performed only by the
function set at AP2-20.
1
Start
Pump clean is performed each time the
inverter starts operating.
2
Stop
Pump clean is performed each time the
inverter stops operating.
3
Start &
Stop
Pump clean is performed each time the
inverter starts or stops operating.
AP2-17 PC Curve Rate
AP2-18 PC Curve Band
AP2-19 PC Curve DT
If AP2-
15 is set to ‘Power’ or ‘Current,’ multiply the load
characteristic curve set at AP2-2
–AP2-10 by the value set at
AP2-17 (100[%]+AP2-17[%]), and reset the load
characteristic curve for the pump clean operation (refer to the
load tune features for AP2-2
–AP2-10 setting values).
Apply (rated inverter current x AP2-18 setting value) and
(rated motor x AP2-18 setting value) to the pump clean load
curve calculated by AP2-17 to calculate the final pump clean
load curve.
The inverter performs pump clean operation when the
inverter continues operating for the time set at AP2-19.
AP2-20 Clean Start DT
When AP2-
15 is set to ‘Power’ or ‘Current’, a pump clean is
performed if the inverter operation power or current stays
above the pump clean load characteristic curve (defined by
AP2-17 and AP2-18) for the time set at AP2-19.
AP2-21 Clean Step DT
Sets the time for the inverter to maintain 0 speed (stop)
before the inverter switches from forward to reverse operation
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...