![LS ELECTRIC LSLV-H100 Series Скачать руководство пользователя страница 73](http://html1.mh-extra.com/html/ls-electric/lslv-h100-series/lslv-h100-series_user-manual_1943798073.webp)
Perform Basic Operations
60
Parameter Setting Mode
The following table lists the functions groups under Parameter mode.
Function Group Name Keypad Display Description
Drive
DRV
Configures basic operation parameters. These
include jog operation, motor capacity evaluation, and
torque boost.
Basic
BAS
Configures basic operation parameters. These
parameters include motor parameters and multi-step
frequency parameters.
Advanced
ADV
Configures acceleration or deceleration patterns,
frequency limits, energy saving features, and,
regeneration prevention features.
Control
CON
Configures the features related to speed search and
KEB (kinetic energy buffering).
Input Terminal
IN
Configures input terminal
–related features, including
digital multi
–functional inputs and analog inputs.
Output Terminal
OUT
Configures output terminal
–related features,
including digital multi
–functional outputs and analog
outputs.
Communication
COM
Configures the USB-related features and
communication features for the RS-485, Modbus-
RTU, LS Bus, Metasys N2, and BACnet. Optional
communication module related features may be
configured as well, if one is installed.
PID process
PID
Configures the PID control-related features.
EPID process
EPI
Configures the external PID control-related features.
Application 1
AP1
Configures the Sleep Boost, SoftFill, and Multiple
motor control (MMC) features related to the PID
control.
Application 2
AP2
Configures the HVAC features by setting the features
such as load tuning, pump cleaning, and pay back
counter.
Application 3
AP3
Configures the time event-related features.
Protection
PRT
Configures motor and inverter protection features.
Motor 2 (Secondary
motor)
M2
Configures the secondary motor-related features.
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...