![LS ELECTRIC LSLV-H100 Series Скачать руководство пользователя страница 249](http://html1.mh-extra.com/html/ls-electric/lslv-h100-series/lslv-h100-series_user-manual_1943798249.webp)
236
Learning Advanced Features
Restart after instantaneous power
interruption
Starting with power-on
Speed search for general acceleration:
If bit 1 is set to ‘1’ and the
inverter operation command runs, acceleration starts with the speed
search operation. When the motor is rotating under load, a fault trip
may occur if the operation command is run for the inverter to provide
voltage output. The speed search function prevents such fault trips
from occurring.
Initialization after a fault trip other than an LV trip:
If bit 2 is set to ‘1’
and PRT-08 (RST Restart)
is set to ‘1 (Yes)’, the speed search
operation automatically accelerates the motor to the operation
frequency used before the fault trip when the [Reset] key is pressed (or
the terminal block is initialized) after a fault trip.
Automatic restart after a power interruption:
If bit 3 is set to ‘1,’ and
if a low voltage trip occurs due to a power interruption but the power is
restored before the internal power shuts down, the speed search
operation accelerates the motor back to its frequency reference before
the low voltage trip.
If an instantaneous power interruption occurs and the input power is
disconnected, the inverter generates a low voltage trip and blocks the
output. When the input power returns, the operation frequency before
the low voltage trip and the voltage is increased by the inverter’s inner
PI control.
If the current increases above the value set at CON-72, the voltage
stops increasing and the frequency decreases (t1 zone). If the current
decreases below the value set at CON-27, the voltage increases again
and the frequency stops decelerating (t2 zone). When the normal
frequency and voltage are resumed, the speed search operation
accelerates the motor back to its frequency reference before the fault
trip.
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...