![LS ELECTRIC LSLV-H100 Series Скачать руководство пользователя страница 613](http://html1.mh-extra.com/html/ls-electric/lslv-h100-series/lslv-h100-series_user-manual_1943798613.webp)
600
option trip ............................... 332, Refer to
Option Trip-x
Option Trip-1 ................................................................................ 539
Option Trip-x
option trip ........................................................... 339
OUT (Output terminal function group) .......... 60, 427
Out Phase Open ........................................................................ 537
output block by multi-function terminal ................ 331
output open-phase fault trip ...... Refer to
Out Phase
Open
output terminal ............................ Refer to R/S/T terminal
Output terminal function group ............ Refer to OUT
(Output terminal function group)
output/communication terminal ...................................... 39
24 terminal
.......................................................... 40
A1/C1/B1 terminal
............................................. 40
AO terminal
........................................................ 39
EG terminal
........................................................ 40
S+/S-/SG terminal
............................................. 40
over current trip .......................... Refer to
Over Current1
Over Current1 .............................................................................. 537
Over Current2 .............................................................................. 537
Over Heat ........................................................................................ 537
over heat fault trip .............................. Refer to
Over Heat
Over Load ....................................................................................... 536
Over Load Warning .......................................... 540
overload fault trip ............................................... 339
overload warning ............................................... 340
Over Voltage ................................................................................. 537
over voltage trip ............................ Refer to
Over Voltage
overload....................................................... Refer to
Over Load
overload trip ....................................................... 314
overload warning ............................................... 314
overload rate ................................................................................ 242
overload trip............................................. Refer to
Over Load
P
P(+) terminal (+ DC link terminal) ......................... 33, 34
P/I gain .............................................................................................. 238
P1+ terminal (+ DC link terminal) .................................. 31
P2+ terminal (+ DC link terminal) ......................... 31, 32
P2+/B terminal ............................................................................... 31
P3+ terminals (+ DC link terminal) ................................ 32
parameter ........................................................................................... 70
display changed parameter ............................. 250
hide parameter mode ....................................... 249
initializing the parameters ...................................77
parameter initialization
.................................. 248
parameter lock .................................................. 249
parameter settings ...............................................70
password ........................................................... 249
Parameter Initialization ......................................................... 248
parameter mode........................................................................... 59
parameter setting mode ........................................................ 60
ParaWrite Trip ............................................................................... 539
parmeter
read/write/save ................................................. 247
part names ........................................................................................... 3
parts illustrated ................................................................................. 3
parts life ............................................................................................ 335
capacitor life estimation .................................... 335
fan life ................................................................ 337
password .............................................................................. 249, 380
payback counter ........................................................................ 192
peripheral devices ..................................................................... 575
phase-to-phase voltage ....................................................... 546
PID
flow control ........................................................ 158
pressure control ................................................ 158
speed control .................................................... 158
temperature control .......................................... 158
PID (Advanced function group) ..................................... 440
PID (PID control) group .......................................................... 60
PID control
PID openloop .................................................... 177
PID operation sleep
mode ............................... 175
PID operation switching ................................... 177
PID reference .................................................... 169
PID control group ................ Refer to PID (PID control)
group)
pipe break ....................................................................................... 207
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...