601
목차
pipe break dectection control
Pipe Broken ....................................................... 207
pipe break detection control
Pipe Broken ....................................................... 539
Pipe Broken Warning........................................ 540
Pipe Broken fault trip ........... Refer to
PipeBroken Trip
PNP mode (Source).................................................................... 41
PNP/NPN mode selection switch (SW2) ................... 36
NPN mode (Sink) ................................................ 42
PNP mode (Source) ........................................... 41
post-installation checklist ....................................................... 48
potentiometer ................................................................................. 38
power braking ................................................................................ 81
power consumption ................................................... 306, 307
power input terminalRefer to
R/S/T terminal
, Refer
to
R/S/T terminal
, Refer to
R/S/T terminal
power output terminal ......... Refer to
R/S/T terminal
,
Refer to
R/S/T terminal
, Refer to
R/S/T terminal
power terminal board wiring .............................................. 29
power terminals ................................................................... 32, 33
P(+) terminal .................................................. 33, 34
P(+)/B terminal .................................................... 33
P1+ terminal ........................................................ 31
P2+ terminal .................................................. 31, 32
P2+/B terminal ..................................................... 31
P3+ terminal ........................................................ 32
R/S/T terminals................................. 31, 32, 33, 34
U/V/W terminal ................................. 31, 32, 33, 34
PowerOn Resume ..................................................................... 308
PowerOn Resume by serial communication ........ 308
Power-on Run .............................................................................. 108
pre-heating .................................................................................... 209
preparing the installation .......................................................... 1
press regeneration prevention ....................................... 291
P gain/I gain ....................................................... 292
product identification................................................................... 1
product specification details ............................................ 566
protocol
BACnet protocol ................................................ 381
LS INV 485 protocol ......................................... 352
Metasys-N2 protocol......................................... 392
PRT (protection features) group ....................................... 60
PRT (Protection function group) ................................... 479
Pulse output terminal ................. Refer to TO terminal
pump clean .................................................................................... 194
Pump clean trip ................... Refer to
Pump Clean Trip
PWM ................................................................................................... 241
frequency modulation ....................................... 241
Q
quantizing .......................................................................................... 90
Quantizing
noise .....................................................................90
quick reference ................................................................................ iv
R
R/S/T terminals ........................................ 31, 32, 33, 34, 544
R/S/T terminals .............................................................................. 35
rating
derating .............................................................. 592
rated motor current ........................................... 157
rated motor voltage ........................................... 211
rated slip frequency .......................................... 157
rated slip speed ................................................ 157
rating plate ........................................................................................... 1
reactor .......................................................................................... 18, 19
reactors specifications ........................................................... 578
real-time clock ................................................................................ 23
regenerated energy ................................................................. 132
Reset Restart ................................................................................. 110
settings
............................................................. 240
resonance frequency
carrier frequency ............................................... 241
restarting after a trip
Reset Restart ..................................................... 110
retry number ................................................................................ 110
ripple ...................................................................................................... 91
RS-232 ............................................................................................... 343
communication ................................................. 343
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...