197
Learning Advanced Features
•
If the pump clean operation is configured for terminal input and it is turned on, and if ADV-
10 (PowerOn Resume) is set to ‘Yes’, a pump clean operation is performed when the
inverter is turned on.
•
When performing a pump clean operation via terminal input,
-
if the terminal input is turned off instantly after it is turned on (the operation is
triggered), 1 pump clean cycle is operated.
-
if ADV-
10 (PowerOn Resume) is set to ‘Yes’, and the terminal input is turned off
instantly after it is turned on (the operation is triggered), and if the inverter is turned
off during a pump clean then is turned back on again, the pump clean operation is
not resumed (because the input terminal is not on when the inverter is turned on).
-
if the terminal input is kept on after it is initially turned on, 1 pump clean cycle is
operated.
5.15 Start & End Ramp Operation
This function is used to rapidly accelerate the pump to the normal operating level, or to
rapidly decelerate the pump and stop it. Start & End ramp operation is performed when
ADV-
24 (Freq Limit) is set to ‘1 (Yes).’
Group Code Name
LCD Display
Parameter Setting Setting Range Unit
AP2
40
Start & End
Ramp Gradient
Start&End
Ramp
0: No
0
No
-
1
Yes
41
StartRampAcc
StartRampAcc
10.0
0
–600.0
Sec
42
EndRampDec
EndRampDec
10.0
0
–600.0
Sec
ADV
24
Frequency limit
options
Freq Limit
0: No
0
No
-
1
Yes
25
Low Freq
minimum value
Freq Limit Lo
30.00
Start Freq
–
Max Freq
Hz
26
Low Freq
maximum value
Freq Limit Hi
60.00
Freq Limit
Lo
–Max Freq
Hz
Start & End Ramp Operation Setting Details
Code
Description
AP2-40 Start&End
Ramp
Sets the pump Start & End Ramp options.
Setting
Function
0
No
The Start & End Ramp operation is not used.
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...