218
Learning Advanced Features
Code
Description
AP3-13
–AP3-22
Period 1~4 Day
The Time period date for the operation can be set up to 4. It can be
set on a weekly basis. If the bit is ‘1 (on)’, it indicates the relevant
day is selected. If
the Bit is ‘0 (off)’, it indicates the relevant day is
not selected.
Bit
6
5
4
3
2
1
0
Sunday
Monday
Tuesday Wednesday Thursday Friday
Saturday
AP3-30
–AP3-51
Exception1
–8 Start T
The operation start time for the 8 Exception days can be set.
AP3-31
–AP3-52
Exception1
–8 Stop T
The operation end time for the 8 Exception days can be set.
AP3-32
–AP3-53
Exception1
–8 Date
The date for the 8 Exception days can be set.
AP3-70 Time Event En
Enables or disables the Time Event
Setting
Function
0
No
Time Event is not used.
1
Yes
Time Event is used.
AP3-71 T-Event Status
It shows which T-Event from 1
–8 is being performed.
7
6
5
4
3
2
1
0
T-
Event
8
T-
Event
7
T-
Event
6
T-
Event
5
T-
Event
4
T-
Event
3
T-
Event
2
T-
Event
1
AP3-72
–86 T-Event1–8
Period
Select the desired module of the Time Module and Exception Day
set in AP3-11
–AP3-53 for the relevant events.
If the bit is 1, it indicates the relevant Time Module or Exception Day
is selected. If the Bit is 0, it indicates the Time Module or Exception
Day is not selected.
bit
11
10
9
8
7
6
5
4
3
2
1
0
E
x
c
e
p
tio
n
D
a
te
8
E
x
c
e
p
tio
n
D
a
te
7
E
x
c
e
p
tio
n
D
a
te
6
E
x
c
e
p
tio
n
D
a
te
5
E
x
c
e
p
tio
n
D
a
te
4
E
x
c
e
p
tio
n
D
a
te
3
E
x
c
e
p
tio
n
D
a
te
2
E
x
c
e
p
tio
n
D
a
te
1
P
e
rio
d
4
P
e
rio
d
3
P
e
rio
d
2
P
e
rio
d
1
AP3-73
–87 T-Event1–8
Define
Select the desired Event.
Setting
0
None
16 PID Openloop
1
Fx
17 PID Gain 2
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...