Learning Advanced Features
5.8.3 PID Sleep Mode
If an operation continues at a frequency lower than the PID operation conditions, a boost
operation is performed to extend sleep mode by raising the PID Reference, and then the
inverter enters PID sleep mode. In PID sleep mode, the inverter resumes PID operation
when the PID feedback falls below the PID Wakeup level and maintains the condition for
the time set at AP1-09 (PID WakeUp1 DT) or AP1-13 (PID WakeUp2DT).
Note
PID Wakeup level may be calculated using the following formula:
PID Wakeup Level = PID-04 (PID Ref Value)
–AP1-10 (PID WakeUp1Dev) or, PID-04 (PID Ref
Value) - AP1-14 PID (WakeUp2Dev).
Two sets of configurations are available in PID sleep mode for sleep mode frequency, sleep
mode delay time, wakeup variation, and wakeup delay time. One of the two configurations
may be selected depending on the multi-function input terminal configuration and input
conditions.
Group Code Name
LCD Displays
Parameter Setting Setting Range
Unit
AP1
05
Sleep boost
settings
Sleep Bst Set 0.00
0
–Unit Max
Unit
06
Sleep boost speed
Sleep Bst
Freq
60.00
0.00, Low
Freq
–High
Freq
Hz
07
PID sleep mode 1
delay time
PID Sleep 1
DT
20.0
0
–6000.0
sec
08
PID sleep mode 1
frequency
PID
Sleep1Freq
0.00
0.00, Low
Freq
–High
Freq
Hz
09
PID wakeup 1
delay time
PID
WakeUp1 DT
20.0
0
–6000.0
sec
10
PID wakeup 1
value
PID
WakeUp1Dev
20.00
0
–Unit Band
Unit
11
PID sleep mode 2
delay time
PID Sleep 2
DT
20.0
0
–6000.0
sec
12
PID sleep mode 2
frequency
PID
Sleep2Freq
0.00
0.00, Low
Freq
–High
Freq
Hz
Содержание LSLV-H100 Series
Страница 17: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 18: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 19: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 20: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 21: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 22: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 35: ...Installing the Inverter 22 ...
Страница 50: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 104: ...91 Learning Basic Features 0 10 V Input Voltage Setting Details V1 Quantizing ...
Страница 181: ...168 Learning Advanced Features PID Command Block ...
Страница 182: ...169 Learning Advanced Features ...
Страница 183: ...170 Learning Advanced Features PID Feedback Block ...
Страница 184: ...171 Learning Advanced Features PID Output Block ...
Страница 185: ...172 Learning Advanced Features PID Output Mode Block ...
Страница 198: ...185 Learning Advanced Features EPID1 Control block ...
Страница 199: ...186 Learning Advanced Features EPID2 Control block ...
Страница 220: ...207 Learning Advanced Features ...
Страница 235: ...222 Learning Advanced Features The Time Chart for the Exception Day ...
Страница 506: ...Table of Functions 493 ...
Страница 520: ...Table of Functions 507 8 16 4 Cooling Tower MC4 Group ...
Страница 549: ...Troubleshooting 536 ...
Страница 569: ...Technical Specification 556 11 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 570: ...Technical Specification 557 110 185 kW 3 phase ...
Страница 601: ...588 ...
Страница 602: ...589 ...
Страница 603: ...590 ...