Operating Instructions
51
9. Check vacuum valve for proper operation.
10. Observe the unit for proper operation and functions during Pre-load Operation.
Power Selection
The refrigeration unit is designed to operate on 460/380V, 3 Phase, 60-50 Hz electric power from a 4-wire
power source.
•
To operate the refrigeration unit on 460/380V power, plug the 460/380V power cord into the proper
power source.
Pre-load Operation
Pre-Trip Conditions
To properly perform a Full Pretrip Test on units equipped with the MPC2000 or MPC2000ID controller,
the following conditions must exist:
Pre-Trip Checks
1. With unit connected to the proper power supply, turn the power supply On/Off switch to ON.
2. Switch refrigeration unit On/Off switch to ON position. A sequence start of the required loads occurs
during initial start-up on cooling:
•
Controller LED display turns On and then Off.
•
LED display briefly shows setpoint and then displays the controlling (return) air sensor
temperature.
•
Controller senses the incoming power phase and selects the correct power phase to unit
components.
•
Evaporator fan motors start and operate on low speed.
•
R-134a compressor and condenser fan then start and the liquid line solenoid energizes (opens).
•
R-23 compressor starts 30 seconds later.
NOTE: If one or both compressors fail to start, turn the On/Off switch OFF. Then repeat steps 1 and 2.
If the unit still does not start, refer to “Alarm Codes, Descriptions and Corrective Actions” in the
Microprocessor Controller chapter of this manual. Be sure to wait up to 1 minute for both compressors
to start.
3. Adjust controller setpoint to the desired temperature:
NOTE: The setpoint temperature can be set between -10 C and -60 C (14 F and -76 F) in either F or C
using the C/F key. Just press and hold the F/C key (to display the alternate temperature scale).
•
Press SETPOINT key to display cursor flashing in the “TEMP SETP” line
•
Press F4 key to enter new setpoint. Enter Arrow appears in the menu line and the current setpoint
disappears.
CAUTION: Power supply connections from the unit to the power source should always be
made with the refrigeration unit On/Off switch and the power supply On/Off switch in the OFF
position. Never attempt to start or stop the refrigeration unit using the power cord.
Содержание Thermo King CRR DF MPC2000
Страница 5: ...4 ...
Страница 11: ...List of Figures 10 ...
Страница 13: ...Introduction 12 ...
Страница 19: ...Safety Precautions 18 ...
Страница 21: ...Service Guide 20 ...
Страница 47: ...Unit Description 46 ...
Страница 97: ...Microprocessor Controller 96 ...
Страница 101: ...Electrical Maintenance 100 ...
Страница 141: ...Structural Accessory Maintenance 140 ...
Страница 147: ...Refrigeration System Diagnosis 146 ...
Страница 149: ...Electrical Refrigeration and Controller Menu Flow Diagrams 148 This page intentionally left blank ...
Страница 150: ...149 CRR DF MPC2000 Controller Diagram ...
Страница 151: ...150 CRR DF MPC2000 Main Relay Board Electrical Diagram ...
Страница 152: ...151 CRR DF MPC2000 Unit Wiring Schematic Low Speed Winding ...
Страница 153: ...152 CRR DF MP3000A Controller Diagram ...
Страница 154: ...153 CRR DF MP3000A Main Relay Board Electrical Diagram ...
Страница 155: ...154 CRR DF MP3000A Unit Wiring Schematic Low Speed Winding ...
Страница 157: ...156 CRR DF Refrigeration System Components Page 2 of 2 ...
Страница 159: ...158 CRR DF Off Cycle Standby Flow and Pressure Diagram Page 2 of 2 CRR DF Off Cycle Standby Flow and Pressure Diagram ...
Страница 161: ...160 CRR DF Full Cool Flow and Pressure Diagram Page 2 of 2 ...
Страница 163: ...162 CRR DR Evacuation Station and Unit Connections Page 2 of 2 ...