![Ingersoll-Rand Thermo King CRR DF MPC2000 Скачать руководство пользователя страница 136](http://html.mh-extra.com/html/ingersoll-rand/thermo-king-crr-df-mpc2000/thermo-king-crr-df-mpc2000_maintenance-manual_2060249136.webp)
Refrigeration Maintenance and Service Operations
135
•
R-134a Compressor: Pump down the compressor to -35 kPa, -0.35 bar, 10 in. vacuum.
•
R-23 Compressor: Pump down the compressor to 0 to 21 kPa, 0.0 to 0.2 bar, 0 to 3 psig.
2. Open the suction service valve slightly to equalize the pressure between 10 and 20 kPa, 0.10 and 0.20
bar, 1 and 3 psig.
3. Front seat the discharge service valve.
4. Purge the high pressure from the compressor head through the service port on the discharge line.
5. Disconnect the leads from the wire harness and remove the switch from the compressor discharge
manifold (or remove the sensor from the compressor head).
Installation
1. Apply a refrigeration locktite (sealant) to the threads of the switch (or sensor).
2. Install and tighten the switch (or sensor). Connect the leads to the wire harness.
3. Open discharge service valve slightly to pressurize the compressor head and tube assembly. Check for
leaks (see “Refrigerant Leak Test Procedure” in this chapter). Front seat the discharge service valve.
4. If no leaks are found, recover the leak test gas (see “Refrigerant Recovery” in this chapter).
5. Open the suction service valve and compressor discharge service valve and place the unit in
operation.
Liquid Line Solenoid Valve Replacement (R-134a System Only)
Removal
1. Close the liquid line service valve and pump down the low side to -35 kPa, -0.35 bar, 10 in. vacuum.
Break the vacuum with nitrogen between 10 and 20 kPa, 0.10 and 0.20 bar, 1 and 3 psig.
2. Turn the unit On-Off switch OFF. Disconnect electrical connections to liquid line solenoid.
NOTE: In most cases, only the coil requires replacement. No other repair is possible on the liquid line
solenoid.
3. Unsolder the liquid line connections from the valve.
4. Remove the valve from the unit.
Installation
1. Clean the tubes for soldering.
2. Place the new valve in position and solder the connections.
CAUTION: Do NOT allow the R-23 scroll compressor to operate for more than 10-20 seconds.
CAUTION: Any time the discharge valve is front seated, disconnect the unit power source to
prevent accidental compressor start-up.
Содержание Thermo King CRR DF MPC2000
Страница 5: ...4 ...
Страница 11: ...List of Figures 10 ...
Страница 13: ...Introduction 12 ...
Страница 19: ...Safety Precautions 18 ...
Страница 21: ...Service Guide 20 ...
Страница 47: ...Unit Description 46 ...
Страница 97: ...Microprocessor Controller 96 ...
Страница 101: ...Electrical Maintenance 100 ...
Страница 141: ...Structural Accessory Maintenance 140 ...
Страница 147: ...Refrigeration System Diagnosis 146 ...
Страница 149: ...Electrical Refrigeration and Controller Menu Flow Diagrams 148 This page intentionally left blank ...
Страница 150: ...149 CRR DF MPC2000 Controller Diagram ...
Страница 151: ...150 CRR DF MPC2000 Main Relay Board Electrical Diagram ...
Страница 152: ...151 CRR DF MPC2000 Unit Wiring Schematic Low Speed Winding ...
Страница 153: ...152 CRR DF MP3000A Controller Diagram ...
Страница 154: ...153 CRR DF MP3000A Main Relay Board Electrical Diagram ...
Страница 155: ...154 CRR DF MP3000A Unit Wiring Schematic Low Speed Winding ...
Страница 157: ...156 CRR DF Refrigeration System Components Page 2 of 2 ...
Страница 159: ...158 CRR DF Off Cycle Standby Flow and Pressure Diagram Page 2 of 2 CRR DF Off Cycle Standby Flow and Pressure Diagram ...
Страница 161: ...160 CRR DF Full Cool Flow and Pressure Diagram Page 2 of 2 ...
Страница 163: ...162 CRR DR Evacuation Station and Unit Connections Page 2 of 2 ...