![Ingersoll-Rand Thermo King CRR DF MPC2000 Скачать руководство пользователя страница 107](http://html.mh-extra.com/html/ingersoll-rand/thermo-king-crr-df-mpc2000/thermo-king-crr-df-mpc2000_maintenance-manual_2060249107.webp)
Refrigeration Maintenance and Service Operations
106
R-134a Gauge Manifold Set (With Low Loss Fittings) Attachment
And Purging
Thermo King recommends the use of access valves or self-sealing, quick disconnect fittings whenever
possible to limit the loss of refrigerant into the atmosphere. A separate gauge manifold set with low loss
fittings (P/N 204-758) should be dedicated for use with HFC refrigerants only. Gauge hoses should also
be dedicated to HFC refrigerant.
NOTE: When any of these devices are used, carefully check to ensure that access connections are
functioning properly.
R-134a Gauge Manifold Set Installation
NOTE: The following procedure purges the gauge hoses and must be followed when using new gauges
or hoses for the first time. The system should be operating on Cool (10 psig [69 kPa] or greater suction
pressure) when using this procedure to purge the low side hose. Gauge hoses may be removed and
re-installed without additional purging so long as a slight positive pressure remains in the manifold
and lines when removed from the unit.
1. Inspect gauge manifold for proper hose and fitting connections.
2. Clean dirt and moisture from around service ports.
3. Remove small service port caps from suction and discharge service fittings. Save and re-use the caps
and sealing washers or gaskets.
4. Rotate both hose coupler hand wheels counterclockwise to back the stem out of the high and low hose
fittings. Then attach low hose (compound gauge) to the suction line valve port.
5. With 69 kPa, 0.69 bar, 10 psig or greater pressure in the low side (unit operating on Cool), open the
suction service manifold hand valve fully. Then rotate the suction hose fitting hand wheel clockwise
to open (depress) the suction line port valve to the low hose.
6. Slowly screw a 1/2 inch ACME fitting into the low loss fitting on the manifold’s service (center) line
to purge the suction and service hoses. Remove ACME fitting after purging.
7. Close the suction service manifold hand valve fully to center port.
8. Attach high side hose (pressure gauge) to the discharge service line port.
9. Open discharge service manifold hand valve fully. Then rotate discharge fitting hand wheel clockwise
to open (depress) discharge line port valve to the high hose.
10. Slowly screw a 1/2 inch ACME fitting into the manifold’s service (center) line to purge the high and
service hoses. Remove ACME fitting after purging.
11. Close discharge service manifold hand valve fully to center port. You are now ready to use the gauge
manifold to check system pressures or perform MOST service procedures.
CAUTION: Due to extremely high pressure in normal ambient, R23 cannot be reclaimed by use
of reclaim station.
Содержание Thermo King CRR DF MPC2000
Страница 5: ...4 ...
Страница 11: ...List of Figures 10 ...
Страница 13: ...Introduction 12 ...
Страница 19: ...Safety Precautions 18 ...
Страница 21: ...Service Guide 20 ...
Страница 47: ...Unit Description 46 ...
Страница 97: ...Microprocessor Controller 96 ...
Страница 101: ...Electrical Maintenance 100 ...
Страница 141: ...Structural Accessory Maintenance 140 ...
Страница 147: ...Refrigeration System Diagnosis 146 ...
Страница 149: ...Electrical Refrigeration and Controller Menu Flow Diagrams 148 This page intentionally left blank ...
Страница 150: ...149 CRR DF MPC2000 Controller Diagram ...
Страница 151: ...150 CRR DF MPC2000 Main Relay Board Electrical Diagram ...
Страница 152: ...151 CRR DF MPC2000 Unit Wiring Schematic Low Speed Winding ...
Страница 153: ...152 CRR DF MP3000A Controller Diagram ...
Страница 154: ...153 CRR DF MP3000A Main Relay Board Electrical Diagram ...
Страница 155: ...154 CRR DF MP3000A Unit Wiring Schematic Low Speed Winding ...
Страница 157: ...156 CRR DF Refrigeration System Components Page 2 of 2 ...
Страница 159: ...158 CRR DF Off Cycle Standby Flow and Pressure Diagram Page 2 of 2 CRR DF Off Cycle Standby Flow and Pressure Diagram ...
Страница 161: ...160 CRR DF Full Cool Flow and Pressure Diagram Page 2 of 2 ...
Страница 163: ...162 CRR DR Evacuation Station and Unit Connections Page 2 of 2 ...