Refrigeration Maintenance and Service Operations
102
•
High side near the compressor discharge service valve,
•
High side on the receiver tank.
An R-134a gauge manifold set (P/N 204-758) should be dedicated for use with R-134a (HFC) refrigerant
only.
Leak Detection
Leaks can be detected with the use of soap bubbles and with Halogen leak detectors such as model H10G,
P/N 204-712 or model H10N, P/N 204-756 (portable).
Vacuum Pump
A two-stage (P/N 204-725), three-stage or five-stage pump is recommended for evacuation. Purging the
system with dry nitrogen is recommended before evacuation. Because residual refrigerant may be present
in used vacuum pumps, a new vacuum pump should be used and dedicated strictly as an HFC refrigerant
pump. Use only recommended vacuum pump oils and change oil after every major evacuation.
Because vacuum pump oils are highly refined to obtain low vacuums, failure to follow these
recommendations may result in acidic conditions that will destroy the pump.
System Cleanup
Cleanup devices such as suction line filters and compressor oil filters may be used if they are properly
cleaned and new filters and cartridges are used. All standard petroleum and synthetic compressor oils
must be removed to prevent the contamination of R-134a or R-23 refrigeration systems.
Refrigerant Recovery
Use only refrigerant recovery equipment approved for and dedicated to HFC refrigeration recovery.
Compressor Oil Acid Test
Perform an oil acid test (oil test kit P/N 203-457) whenever a unit has a substantial refrigerant loss, a
noisy compressor or dark/dirty oil.
Compressor Discharge and Suction Service Valves
The discharge and suction valves isolate the compressor from the high and low sides of the refrigeration
system for system diagnosis, service and repair.
NOTE: The only maintenance possible on the discharge or suction service valve is to periodically
tighten the packing nut or to replace the packing. The valves are a permanently assembled unit and
must be replaced in total if defective.
•
Back Seated: Normal operation position.
•
Open to Service Port: Position for servicing.
•
Front Seated: To check or remove compressor.
WARNING: Do not start unit with discharge valve in FRONT SEATED position.
Содержание Thermo King CRR DF MPC2000
Страница 5: ...4 ...
Страница 11: ...List of Figures 10 ...
Страница 13: ...Introduction 12 ...
Страница 19: ...Safety Precautions 18 ...
Страница 21: ...Service Guide 20 ...
Страница 47: ...Unit Description 46 ...
Страница 97: ...Microprocessor Controller 96 ...
Страница 101: ...Electrical Maintenance 100 ...
Страница 141: ...Structural Accessory Maintenance 140 ...
Страница 147: ...Refrigeration System Diagnosis 146 ...
Страница 149: ...Electrical Refrigeration and Controller Menu Flow Diagrams 148 This page intentionally left blank ...
Страница 150: ...149 CRR DF MPC2000 Controller Diagram ...
Страница 151: ...150 CRR DF MPC2000 Main Relay Board Electrical Diagram ...
Страница 152: ...151 CRR DF MPC2000 Unit Wiring Schematic Low Speed Winding ...
Страница 153: ...152 CRR DF MP3000A Controller Diagram ...
Страница 154: ...153 CRR DF MP3000A Main Relay Board Electrical Diagram ...
Страница 155: ...154 CRR DF MP3000A Unit Wiring Schematic Low Speed Winding ...
Страница 157: ...156 CRR DF Refrigeration System Components Page 2 of 2 ...
Страница 159: ...158 CRR DF Off Cycle Standby Flow and Pressure Diagram Page 2 of 2 CRR DF Off Cycle Standby Flow and Pressure Diagram ...
Страница 161: ...160 CRR DF Full Cool Flow and Pressure Diagram Page 2 of 2 ...
Страница 163: ...162 CRR DR Evacuation Station and Unit Connections Page 2 of 2 ...