Figure 4-12 Drainpipe routing (bottom pipe routing)
(1) Drainpipe
(2) Water trap
NO TE
● As shown in the preceding figure, the water trap should be installed on the main
drainpipe.
● The horizontal gradient of the branch drainpipe along the water flow direction is not
less than 1%, and the horizontal gradient of the main drainpipe is not less than 3‰.
Step 1 Install the drainpipe.
Figure 4-13 Installing the drainpipe
NO TICE
● Clean the external water pipes before connecting them to the water inlet and
outlet pipes of the unit.
● The water inlet and outlet pipes of the unit are connected using pipe screw
threads. Do not exert excessive force when connecting the pipes to avoid
damaging the pipes. (Use two pipe pliers or chain pliers to connect pipes.)
● The water pipes are connected using thread connectors. The threaded joints
must be sealed with sealing tape or thread adhesive.
● When connecting water pipes, use appropriate active connectors and secure
them using a wrench.
● The water pipe must be wrapped with thermal insulation foam (including the
buried pipe) with a thickness of at least 3 cm.
----End
Sealing
1. Remove the paper protective film from the sealing putty.
FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
4 System Installation (FDC Scenario)
Issue 02 (2021-04-15)
Copyright © Huawei Technologies Co., Ltd.
78