Table 3-7 Post-installation checklist
No.
Item
Check Method
Expected Result
1
Contact between
devices and concrete
platforms
Observe.
The device is in close
contact with and
evenly supported by
the concrete
platforms.
2
Bolts and nuts
Partially tighten them
using a wrench.
Bolts and nuts are
tightened.
3
Maintenance door
Open and close the
maintenance doors.
All maintenance doors
can be smoothly
opened and closed.
3.3.3 Checking the Refrigerant
Procedure
Step 1 Remove the adjustable side panels for the compressor.
Step 2 Check whether any of the needle valve bonnets shown in
1. If any bonnet is missing, contact Huawei technical support.
2. If no bonnet is missing, remove the valve bonnets, and press the valve plugs
using the valve bonnets in turn. If gas flows out, the system is normal. If no
gas flows out, contact Huawei technical support.
Figure 3-9 Needle valve positions
(1) Low-pressure needle valve
(2) Liquid pipe needle valve
----End