Step 4 Connect the cables. Connect one end of the cable to the input of the electric
heater controller, route the cable through the sheet metal hole, and connect the
other end to the transformer terminal in the electric control box.
Figure 3-37 Cable terminal connection
NO TE
● The cable length is about 11 m, and the cable specification is 3 x 1.5 mm
2
.
● Ensure that cable routing does not affect the maintenance of the unit.
● Cables must be protected against damage.
Step 5 Route the heating belt and temperature sensor probe through the condensate
drainage hole, wrap the heating belt around the condensate drainpipe, and ensure
that the temperature sensor probe is closely attached to the drainpipe.
Step 6 Use silicone sealant to seal the gaps between the heating belt, cables, pipe, and
wall panels.
Step 7 Use thermal insulation foam to wrap the heating belt and temperature sensor
probe around the pipe.
Step 8 Press the SET button on the electric heater controller for 2s. Within 10s, press
and to set the parameter to 5°C, and press the SET button to save the setting.
----End
FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
3 System Installation (Building Scenario)
Issue 02 (2021-04-15)
Copyright © Huawei Technologies Co., Ltd.
63