4.22 Upper Frame and Base Shroud
Chapter 4: Removal, Replacement, and Adjustment Procedures
3.
Install the washer (D), lockwasher (B), and bolt (A) to attach the upper
frame to the hydraulic cylinder.
4.
Tighten the bolt (A) to 125 + 19 in-lb (14.1 + 2.1 N·m) of torque.
5.
If the stretcher is an OB/GYN Stretcher, replace the upper frame catch
shroud (refer to procedure 4.23).
6.
Do the “Function Checks” on page 2-3.
Page 4 - 68
Hill-Rom® Transport, Procedural, and Specialty Stretchers
Service Manual (144386 REV 2)
Содержание P8000
Страница 2: ......
Страница 14: ...NOTES Page xii Hill Rom Transport Procedural and Specialty Stretchers Service Manual 144386 REV 2 ...
Страница 441: ...Schematic Wiring Diagram Control Board P N 49603 ...
Страница 442: ...Schematic Wiring Diagram Electric Stretcher P N 60389 ...
Страница 443: ......