4.33 Scale—Load Beam
Chapter 4: Removal, Replacement, and Adjustment Procedures
16. Remove the screw (N) that attaches the ground strap (O) to the upper frame
(M).
WARNING:
Do not work under an unsupported load. Install applicable temporary
supports. Failure to do so could cause personal injury or equipment
damage.
17. Put jack stands under the frame at the applicable end of the stretcher.
18. Remove and keep the bolt (P), lockwasher (Q), and washer (R) that attach
the load beam (S) to the hydraulic cylinder. Refer to the applicable figure:
•
Procedural Stretcher with the Auto Contour™ feature
•
Procedural Stretcher without the Auto Contour™ feature, Trauma
Stretcher, or Electric Stretcher
(see figure 4-55 on page 4-106)
19. At each end of the load beam (S), remove the bracket that attaches the load
beam to the upper frame (M):
• Head-end load beam—loosen the setscrew, and remove the nuts (T),
screws (U), block (V), and bracket (W).
• Foot-end load beam—remove the nuts (T), screws (U), spacers (X) roller
guides (Y), and brackets (Z).
4
CAUTION:
When you remove a load beam, make sure not to tap on the load beam
cells or the cables that come from the load beams. Equipment damage
could occur.
20. Remove the load beam (S). To loosen the load beam from the hydraulic
cylinder, it may be necessary to tap on the underside of the load beam with
a rubber mallet/hammer. Make sure not to tap on the load beam cells or
load beam cables.
Hill-Rom® Transport, Procedural, and Specialty Stretchers
Page 4 - 103
Service Manual (144386 REV 2)
Содержание P8000
Страница 2: ......
Страница 14: ...NOTES Page xii Hill Rom Transport Procedural and Specialty Stretchers Service Manual 144386 REV 2 ...
Страница 441: ...Schematic Wiring Diagram Control Board P N 49603 ...
Страница 442: ...Schematic Wiring Diagram Electric Stretcher P N 60389 ...
Страница 443: ......