4.19 Electric (P8020) Stretcher—Knee Drive Assembly
Chapter 4: Removal, Replacement, and Adjustment Procedures
6.
Install the ground screw (B) that attaches the ground strap (K) to the knee
drive assembly (E).
7.
Support the knee drive assembly (E), and put the crank handle (I) in the
knee drive assembly.
8.
Align the hole in the crank handle (I) with the hole in the knee drive
assembly (E). Install the roll pin (H) through the crank handle (I) and the
knee drive assembly (E).
9.
Apply blue Loctite®
1
242 adhesive to the threads of the actuator mounting
bolts (A).
10. Tighten the two actuator mounting bolts (A) that attach the knee drive
assembly (E) to the base frame bracket (L).
11. Plug the stretcher into an applicable power source.
12. Do the “Function Checks” on page 2-3.
4
1. Loctite® is a registered trademark of Loctite Corporation.
Hill-Rom® Transport, Procedural, and Specialty Stretchers
Page 4 - 55
Service Manual (144386 REV 2)
Содержание P8000
Страница 2: ......
Страница 14: ...NOTES Page xii Hill Rom Transport Procedural and Specialty Stretchers Service Manual 144386 REV 2 ...
Страница 441: ...Schematic Wiring Diagram Control Board P N 49603 ...
Страница 442: ...Schematic Wiring Diagram Electric Stretcher P N 60389 ...
Страница 443: ......