7.7 IV Transporter (P491)
Chapter 7: Accessories
7.
Put one Oilite®
1
bushing (F) on the threaded end of the tow bar post
weldment (E).
8.
Install threaded end of tow bar post weldment (E) through the hole in the
base frame.
9.
Install one Oilite® bushing (G), D-washer (H), one belleville washer (I)
(concave up), one belleville washer (J) (concave down), one belleville
washer (K) (concave up), and castle nut (L) to secure the tow bar post
weldment (E) to the base frame.
10. Tighten the castle nut (L) to 200 in-lb (22.6 N·m) of torque.
11. Swing the arm through a full range of motion. Make sure the tow arm does
not make a squeaking noise. If you hear a squeaking noise, loosen the
castle nut until the squeaking stops.
12. Install a portable IV pole into the transporter. Make sure the transporter
arm stays in position when the stretcher is moved.
13. See if the slot in the castle nut (L) aligns with the hole in the tow bar post
weldment (E). If the hole and slot do not line up, tighten or loosen the
castle nut (L) just enough to align the slots.
14. Insert the cotter pin (M) through the castle nut (L) and the tow bar post
weldment (E).
15. Bend the cotter pin (M) around the castle nut (L).
16. Put the tow arm assembly (A) over the tow bar post weldment (E), and
insert the headed pin (B) through the tow arm assembly (A) and tow bar
post weldment (E).
17. Install the retaining ring (C) to secure the headed pin (B).
1. Oilite® is a registered trademark of Beemer Precision, Incorporated.
Page 7 - 12
Hill-Rom® Transport, Procedural, and Specialty Stretchers
Service Manual (144386 REV 2)
Содержание P8000
Страница 2: ......
Страница 14: ...NOTES Page xii Hill Rom Transport Procedural and Specialty Stretchers Service Manual 144386 REV 2 ...
Страница 441: ...Schematic Wiring Diagram Control Board P N 49603 ...
Страница 442: ...Schematic Wiring Diagram Electric Stretcher P N 60389 ...
Страница 443: ......