![Fuji Electric FRENIC-MEGA Скачать руководство пользователя страница 206](http://html1.mh-extra.com/html/fuji-electric/frenic-mega/frenic-mega_instruction-manual_2341853206.webp)
5-87
Circuit Diagram and Configuration
Main Circuit
Configuration of Control Circuit
Summary of Operation
Input
Output
(Status signal and magnetic contactor)
Inverter
operation
ISW50
or
ISW60
Run
command
SW52-1
52-1
SW52-2
52-2
SW88
88
OFF
(Commercial power)
ON
OFF OFF
ON
OFF
OFF OFF
ON
(Inverter)
ON
ON
ON OFF
ON
OFF OFF
Timing Scheme
Switching from inverter operation to commercial-power operation
ISW50
/
ISW60
: ON
→
OFF
(1) The inverter output is shut OFF immediately (Power gate IGBT OFF)
(2) The inverter primary circuit
SW52-1
and the inverter secondary side
SW52-2
are turned OFF immediately.
(3) If a run command is present after an elapse of t1 (0.2 sec + time specified by H13), the commercial power circuit
SW88
is turned ON.
Содержание FRENIC-MEGA
Страница 36: ...2 6 Unit inch mm Refer to Section 2 3 3 9...
Страница 208: ...5 89 Examples of Sequence Circuits 1 Standard sequence 2 Sequence with an emergency switching function...
Страница 356: ...MEMO...
Страница 358: ...Fuji Electric Co Ltd Fuji Electric Corp of America http www fujielectric com fecoa 2011 04 D11 D10...