Test Results
Power Blazer
501
Summary (NI/CSU Emulation)
Summary (NI/CSU Emulation)
From the
Test
menu, tap
Results
, and the
Summary
tab.
Status
Status
indicates the progress of the test as follows:
Idle
(test has not started)
In Progress
Completed
The Pass/Fail verdict is displayed next to the
Test Status
field, when
enabled, based on the following criteria: The worst pair’s
Wire Map
,
Prop. Delay
,
Delay Skew
, and
Length
.
Start Time
Indicates the date and time the test was started. The date and time is reset
every time the test is restarted or reset.
Auto-Response/Manual Loopback Status
Indicates the status of the loopback:
Loopback Active
No Loopback
.
Interface
on page 374 for more information on Interface alarms/errors.
DS1
on page 353 for more information on DS1 alarms/errors.
Содержание Power Blazer 88000 Series
Страница 1: ...User Guide 88000 Series Power Blazer HIGH SPEED MULTISERVICE TEST MODULE ...
Страница 12: ......
Страница 16: ......
Страница 22: ......
Страница 28: ......
Страница 38: ......
Страница 58: ...Test Setup Test Applications 46 88000 Series OTN BERT ...
Страница 64: ...Test Setup Test Applications 52 88000 Series SONET SDH BERT For SDH BERT ...
Страница 69: ...Test Setup Test Applications Power Blazer 57 SONET SDH DSn PDH BERT For SDH ...
Страница 550: ......
Страница 670: ......
Страница 674: ......
Страница 686: ......
Страница 707: ...Glossary Power Blazer 695 10G Ethernet Client The following figure presents a typical network application ...
Страница 721: ...Glossary Power Blazer 709 Ethernet Cables Straight Through Cable 1000 Mbit s Crossover Cable 1000 Mbit s ...
Страница 765: ...Glossary Power Blazer 753 SONET DSn SDH PDH The GUI Grid indicates the TUG 2 x and TUG 3 x values ...