J22 TDLAS Gas Analyzer
Operating Instructions
Hauser
111
c.
Disconnect the phase and neutral wires from the analyzer.
d.
Disconnect the protective ground wire from the analyzer system.
3.
Disconnect all tubing and signal connections.
4.
Cap all inlets and outlets to prevent foreign material such as dust or water from entering the system.
5.
Ensure the analyzer is free from dust, oils or any foreign material. Follow the instructions found in
6.
Pack the equipment in the original packaging in which it was shipped, if available. If the original packaging
material is no longer available, the equipment should be adequately secured (to prevent excessive shock or
vibration).
7.
If returning the analyzer to the factory, complete the Decontamination Form provided by Hauser and
attach to the outside of the shipping package as instructed before
10.5
Packing, shipping, and storage
The J22 TDLAS Gas Analyzer Systems and auxiliary equipment are shipped from the factory in appropriate
packaging. Depending on the size and weight, the packaging may consist of a cardboard-skinned container or a
wooden palletized crate. All inlets and vents are capped and protected when packaged for shipment. The system
should be packed in the original packaging when shipped or stored for any length of time.
If the analyzer has been installed and or operated (even for purposes of a demonstration), the system should be
decontaminated (purged with an inert gas) before powering down the analyzer.
Process samples may contain hazardous material in potentially flammable and/or toxic concentrations.
Personnel should have a thorough knowledge and understanding of the physical properties of the sample and
prescribed safety precautions before installing, operating or maintaining the analyzer.
Preparing the analyzer for shipment or storage
1.
Shut off the process gas flow.
2.
Allow all residual gas to dissipate from the lines.
3.
Conduct enclosure purge (optional), if provided with the system.
4.
Connect a purge supply (N
2
) regulated to the specified sample supply pressure to the sample supply port.
5.
Confirm that any valves controlling the sample flow effluent to the low pressure flare or atmospheric vent are
open.
6.
Turn on the purge supply and purge the system to clear any residual process gases.
7.
Turn off the purge supply.
8.
Allow all residual gas to dissipate from the lines.
9.
Close any valves controlling the sample flow effluent to the low pressure flare or atmospheric vent.
10.
Disconnect power to the system.
11.
Disconnect all tubing and signal connections.
12.
Cap all inlets, outlets, vents or gland openings (to prevent foreign material such as dust or water from entering
the system) using the original fittings supplied as part of the packaging from the factory.
13.
Pack the equipment in the original packaging in which it was shipped, if available. If the original packaging
material is no longer available, the equipment should be adequately secured (to prevent excessive shock or
vibration).
14.
If returning the analyzer to the factory, contact Service for a Decontamination Form Service contact. Attach the
form to the outside of the shipping package as instructed before shipping.
Storage
The packaged analyzer should be stored in a sheltered environment that is temperature controlled between -20
°
C to
50
°
C (-4
°
F to 122
°
F), and should not be exposed to rain, snow, caustic or corrosive environments.
10.6
Service contact
For Service, refer to our website (
https://www.endress.com/contact
) for the list of local sales channels in your area.
10.6.1
Before contacting Service
Before contacting Service, prepare the following information to send with your inquiry:
•
Analyzer serial number (SN)
Содержание SpectraSensors J22 TDLAS
Страница 2: ...Operating Instructions J22 TDLAS Gas Analyzer 2 Endress Hauser...
Страница 150: ...www addresses endress com...