Operating Instructions
J22 TDLAS Gas Analyzer
20
Hauser
Fig 11. Channel nut installation on support rail
1 Channel nut
4.
Insert bolts and washers into the through-holes in the fastener clamp (3).
5.
Install the support rail onto the post mount assembly using the provided channel nuts (4).
Fig 12. Support rail installation
6.
Torque bolts to 24.5 Nm (216.9 lb-in.).
Fig 13. Support rail installation
7.
Place clamps on post based on the system configuration.
System Type
Distance (mm)
Distance (in.)
J22 TDLAS Gas Analyzer with SCS on Panel
337
13.3
J22 TDLAS Gas Analyzer with Enclosed SCS
641
25.2
8.
Repeat steps 1 through 6 for second support rail.
9.
Insert M8-1.25 x 25 bolts into support rail and through-holes on the enclosure or sample system panel.
Содержание SpectraSensors J22 TDLAS
Страница 2: ...Operating Instructions J22 TDLAS Gas Analyzer 2 Endress Hauser...
Страница 150: ...www addresses endress com...