Electrical connection
Proline Promass Q 500 PROFIBUS PA
38
Hauser
Order code for "Input; output 1", option GA "PROFIBUS PA"
Order code for
"Electrical connection"
Cable entry
2
Cable entry
3
L, N, P, U
Plug M12 × 1
–
7.1.5
Pin assignment of device plug
1
2
4
3
Pin
Assignment
Coding
Plug/socket
1
+
PROFIBUS PA +
A
Plug
2
Grounding
3
-
PROFIBUS PA –
4
Not assigned
7.1.6
Preparing the measuring device
Carry out the steps in the following order:
1. Mount the sensor and transmitter.
2. Connection housing, sensor: Connect connecting cable.
3. Transmitter: Connect connecting cable.
4. Transmitter: Connect signal cable and cable for supply voltage.
NOTICE
Insufficient sealing of the housing!
Operational reliability of the measuring device could be compromised.
‣
Use suitable cable glands corresponding to the degree of protection.
1. Remove dummy plug if present.
2. If the measuring device is supplied without cable glands:
Provide suitable cable gland for corresponding connecting cable.
3. If the measuring device is supplied with cable glands:
Содержание Proline Promass Q 500
Страница 279: ......
Страница 280: ...www addresses endress com...