Zero point adjustment
All measuring devices are calibrated in accordance with state-of-the-art technology.
Calibration takes place under reference conditions → 253. Therefore, a zero point
adjustment in the field is generally not required.
Experience shows that zero point adjustment is advisable only in special cases:
• To achieve maximum measuring accuracy even with low flow rates
• Under extreme process or operating conditions (e.g. very high process temperatures or
very high-viscosity fluids).
Navigation
"Setup" menu → Advanced setup → Sensor adjustment → Zero point adjustment
‣
Zero point adjustment
Zero point adjustment control
Progress
Parameter overview with brief description
Parameter
Description
Selection / User interface
Factory setting
Zero point adjustment control
Start zero point adjustment.
• Cancel
• Busy
• Zero point adjust failure
• Start
Cancel
Progress
Shows the progress of the process.
0 to 100 %
–
10.7.3 Configuring the totalizer
In the
"Totalizer 1 to n" submenu
the individual totalizer can be configured.
Navigation
"Setup" menu → Advanced setup → Totalizer 1 to n
‣
Totalizer 1 to n
Assign process variable
Unit totalizer
Totalizer operation mode
Control Totalizer 1 to n