Liquistation CSF39
Commissioning
Hauser
49
9
Commissioning
9.1
Function check
L
WARNING
Incorrect connection, incorrect supply voltage
Safety risks for staff and device malfunctions!
‣
Check that all connections have been established correctly in accordance with the
wiring diagram.
‣
Ensure that the supply voltage matches the voltage indicated on the nameplate.
Saving displays as a screenshot
Via the local display, you can take screenshots at any time and save them to an SD
card.
1. Insert an SD card into the SD card slot in the basic module.
2. Press the navigator button for at least 3 seconds.
3. In the context menu select the "Screenshot" item.
The current screen is saved as a bitmap file to the SD card in the "Screenshots"
folder.
9.2
Setting the operating language
Configuring the language
If you have not already done so, close the housing cover and screw the device closed.
1. Switch on the supply voltage.
Wait for the initialization to finish.
2. Press the soft key
MENU
. Set your language in the top menu item.
The device can now be operated in your chosen language.
9.3
Configuring the measuring device
9.3.1
Start screen
You can find the following menu items and soft keys on the initial screen:
•
Select sampling program
•
Edit program %0V
•
Start program %0V
1)
•
MENU
•
MAN
•
MEAS
•
MODE
1)
"%0V" here stands for text that depends on the context. This text is generated automatically by the software and inserted in place of %0V.
Содержание Liquistation CSF39
Страница 2: ......
Страница 188: ...www addresses endress com ...