Installation
Liquistation CSF39
16
Hauser
5.1.2
Installation site
For version with sample pump
1
2
3
4
A0024411
7
Liquistation mounting conditions
1. Correct
The suction line must be routed with a downward slope to the sampling point.
2. Incorrect
The sampler should never be mounted in a place where it is exposed to
aggressive gases.
3. Incorrect
Avoid siphoning effects in the suction line.
4. Incorrect
The suction pipe should never be routed with an upward gradient to the sampling
point.
Note the following when erecting the device:
• Erect the device on a level surface.
• Securely connect the device at the fastening points to the surface underneath.
• Protect the device against additional heating (e.g. heater or direct sunlight in the case of
PS housing).
• Protect the device against mechanical vibrations.
• Protect the device against strong magnetic fields.
• Make sure air can circulate freely at the side panels of the cabinet. Do not mount the
device directly against a wall. Allow at least 150 mm (5.9") from the wall to the left and
right.
• Do not erect the device directly above the inlet channel of a wastewater treatment plant.
Содержание Liquistation CSF39
Страница 2: ......
Страница 188: ...www addresses endress com ...