Installation and commissioning
multi N/C 2100S (duo, pharma)
50
}
Open the furnace lock. To do this, push the interlock (1) upwards.
}
Pull the clip (2) out of the anchoring.
}
Pull the furnace lock open to the left.
}
Unscrew the three hexagon socket screws by half of a rotation with the
right-angle screwdriver. Do not completely unscrew the screws.
}
Push the filled combustion tube into the module until it hits the stop on
the inner ring. The gas outlet must then point downward.
}
Tighten the screws.
}
Close the furnace lock again.
Mount the module on the analyzer as follows:
}
Remove the combustion tube for vertical operation.
}
Remove the sealing plug from the horizontal opening of the combustion
furnace. Place the plug on the vertical opening of the furnace (see im-
age).
}
Attach the holding plate to the angular profiles in front of the horizontal
opening of the combustion furnace with the four knurled head screws.
}
Insert the module into the horizontal opening of the furnace.
The gas outlet of the combustion tube points downward.
}
Fasten the module to the holding plate with three hexagon socket
screws.