multi N/C 2100S (duo, pharma)
Installation and commissioning
51
}
Fasten the gas hose to the gas outlet of the combustion tube.
}
Connect the gas hose and the inlet of the condensation coil.
}
Secure the spherical joint connection with the forked clamp. Tighten the
knurled head screw on the fork clamp hand-tight.
}
Connect the carrier gas hose to the carrier gas outlet of the gas box with
a FAST connector.
}
Screw the other hose end to the module with the Fingertight connection.
}
Connect the plug-in connector of the analyzer to the left side of the mod-
ule.
The software detects that an integrated solids module is connected to the
analyzer via the interface and sets the gas flows accordingly, for example.
}
Close the side wall of the analyzer again.
– Unscrew the knurled head screws and open the middle recess in the
side wall.
– Carefully guide the side wall over the solids module up to the basic
device.
– Apply the grounding conductor.
See also
2