multi N/C 2100S (duo, pharma)
Maintenance and care
85
}
Press the condensation coil into the clamps on the carrier plate (see ar-
row).
}
Attach the hoses:
– Hose 1 connects the TIC condensate container and the condensation
coil.
– Hose 16 leads to the condensate pump.
– Hose 21 leads to the phosphoric acid pump.
– Slide the two FAST connectors at least 1 cm onto the glass connec-
tions.
}
Attach the carrier plate to the mounting bracket on the right side of the
furnace.
The spherical joint connection of the condensation coil points toward the
lower opening of the combustion furnace for this.
}
Connect the Peltier cooling block to the connection on the rear wall (ar-
row)
}
Fasten the carrier plate to the combustion furnace with the knurled head
screw.